Hello,
We're trying to deployed Lotus Notes 8.5.x which on its own is a standard MSI package and therefore very easy to handle using LDMS. However, we also want to chain Fix Pack 3 (a standard .exe installation) afterwards. We want to deploy the two packages together at logon with the option to defer the installation, forcing a reboot when it has all finished.
I have created a new delivery method with the right options which works as I want it - But only with a single package. When I chain the two packages together, the delivery method kicks in multiple times, i.e. The machine reboots between the two installations and then I get the deferral option page up a second time before the installation of the fix pack - Then there's another reboot!
Is there a way to stop this? I want the deferral page to appear only at the start of the chain and then only a single reboot after the second installation.
Please help!
Regards,
Stephen.
PS. We're using LDMS 8.8 with SP4